Cronulla DAF Tank Refurbishment

CLIENT
Sydney Water Corporation/Transfield

LOCATION
Cronulla STP

YEAR
2013


SCOPE OF WORKS
  • Dismantle, sandblast and repair corroded areas
  • Replacement of structural fasteners
  • Replace internal mechanisms as per CONSEP condition assessment report recommendations.
  • Replace short length of weir with stainless steel weir plate
  • Remove and replace existing Sumitomo Cyclo Gearmotor
  • Pre- Commission DAF tank
  • Fabrication and installation of pipe support
EMT delivered this project on time and on budget to meet client emergency breakdown repair requirements, with a high level of quality and safety.
Novotel Cooling Tower Upgrade

CLIENT
Novotel Hotel

LOCATION
Sydney Olympic Park

YEAR
2017


SCOPE OF WORKS
  • Supply & Replace Old Cooling tower louvers(2 off Marley Temcel Units)
  • Supply, Replace and Commissioning of cooling fan, motor, pulleys, bearings, housings, belts.
  • Supply, Replace and Commissioning of VSDs
EMT delivered this project on time and budget to meet client requirements with a high level of quality and safety.
Sydney Water St Marys Clarifiers

CLIENT
Sydney Water Corporation / Transfield

LOCATION
St Marys Treatment Plant

YEAR
2008 - 2012

SCOPE OF WORKS
  • Refurbishment of 8 x Clarifiers (Clarifier No's 5101,5102, 5103,5104 & 5201, 5202, 5203,5204) over four year period.
  • High pressure wash and 'supersuck'
  • Removal of galvanised scraper system
  • Replace with stain
  • Replace drive system
  • Replace bearings
  • Repair slip rings
  • Refurbish Belmouth actuators (Rotork)
EMT delivered this project on time and budget to meet client requirements with a high level of quality and safety.
Sydney Water St Marys Aerators

CLIENT
Sydney Water Corporation / Transfield

LOCATION
St Marys Treatment Plant

YEAR
2012



SCOPE OF WORKS
  • Preliminary site works
  • Pressure wash and clean
  • Replace sealants and cracks
  • Supply and install new aeration units
  • Replace PVC air delivery manifold with SS316,ensuring complete match with existing porting.
EMT delivered this project on time and budget to meet client requirements with a high level of quality and safety.
Water NSW Burrawang Pump Station

CLIENT
Water NSW / Downer

LOCATION
Burrawang Pumping station

YEAR
2017


SCOPE OF WORKS
  • Dismantle and dispose 2 x 4MW Motors and Install 2 x 4MW new motors.
  • Dismantle 2 Vertical turbine Pumps for Refurbishment.
  • Supply and install new platforms to match new motor and pump structure.
  • Assemble pumps on site after service and install them back in its position (work in Progress).
  • Install platform and flow meter in the water channel for flow measurement.
EMT delivered 60% of this project and is in progress rest of the works on time and on budget to meet client requirements, with a high level of quality and safety.
Sydney Water West Camden STP

CLIENT
Sydney Water Corporation / Ventia

LOCATION
West Camden STP

YEAR
2016


SCOPE OF WORKS
  • Inspection, Supply, Installation, Testing and commissioning works carried out (emergency breakdown repair works)
  • Overhaul of the clarifier geared drive Trolley Gearbox
  • Supply and install new Motor
  • Supply and replace drive and non driven wheel Shaft Bearings
  • Removal, supply and installation of new slew ring bearings (geared and ungeared) and slip rings
  • Remove Supply and Install New Scraper Blades
EMT delivered this project on time and on budget to meet client emergency breakdown repair requirements, with a high level of quality and safety.
Sydney Water West Hornsby Clarifier 3

CLIENT
Sydney Water Corporation / Transfield

LOCATION
West Hornsby Treatment Plant

YEAR
2009


SCOPE OF WORKS
  • Refurbishment of Clarifier No 3
  • Strip old Prochem scraper system
  • Replace with Hitachi scraper flights, wear strips, chain, bucket wheels and sprockets.
  • Replace motors and gearboxes.
EMT delivered this project on time and budget to meet client requirements with a high level of quality and safety.
Refurbishment of clarifier & SED.Tank

CLIENT
Hawkesbury City Council

LOCATION
Hawkesbury City Council

YEAR
2019


SCOPE OF WORKS
  • Removal of all the mechanical and electrical component parts
  • Clean and prepare tanks for rebuild
  • Concrete repairing work on both the tanks
  • Epoxy coating of surfaces where specified
  • Fabricate all replacement components in 316 grade stainless steel
  • Reconstruct the clarifier using the new 316 stainless components
  • Replacement of electrical control gear and slipring assembly
  • Testing and commissioning