Cronulla DAF Tank Refurbishment
CLIENT
Sydney Water Corporation/Transfield
LOCATION
Cronulla STP
YEAR
2013
SCOPE OF WORKS
- Dismantle, sandblast and repair corroded areas
- Replacement of structural fasteners
- Replace internal mechanisms as per CONSEP condition assessment report
recommendations.
- Replace short length of weir with stainless steel weir plate
- Remove and replace existing Sumitomo Cyclo Gearmotor
- Pre- Commission DAF tank
- Fabrication and installation of pipe support
EMT delivered this project on time and on budget to meet client emergency breakdown repair
requirements, with a high level of quality and safety.
Novotel Cooling Tower Upgrade
CLIENT
Novotel Hotel
LOCATION
Sydney Olympic Park
YEAR
2017
SCOPE OF WORKS
- Supply & Replace Old Cooling tower louvers(2 off Marley Temcel Units)
- Supply, Replace and Commissioning of cooling fan, motor, pulleys, bearings, housings, belts.
- Supply, Replace and Commissioning of VSDs
EMT delivered this project on time and budget to meet client requirements with a high level of quality
and safety.
Sydney Water St Marys Clarifiers
CLIENT
Sydney Water Corporation / Transfield
LOCATION
St Marys Treatment Plant
YEAR
2008 - 2012
SCOPE OF WORKS
- Refurbishment of 8 x Clarifiers (Clarifier No's 5101,5102, 5103,5104 & 5201, 5202, 5203,5204) over
four year period.
- High pressure wash and 'supersuck'
- Removal of galvanised scraper system
- Replace with stain
- Replace drive system
- Replace bearings
- Repair slip rings
- Refurbish Belmouth actuators (Rotork)
EMT delivered this project on time and budget to meet client requirements with a high level of
quality and safety.
Sydney Water St Marys Aerators
CLIENT
Sydney Water Corporation / Transfield
LOCATION
St Marys Treatment Plant
YEAR
2012
SCOPE OF WORKS
- Preliminary site works
- Pressure wash and clean
- Replace sealants and cracks
- Supply and install new aeration units
- Replace PVC air delivery manifold with SS316,ensuring complete match with existing porting.
EMT delivered this project on time and budget to meet client requirements with a high level of
quality and safety.
Water NSW Burrawang Pump Station
CLIENT
Water NSW / Downer
LOCATION
Burrawang Pumping station
YEAR
2017
SCOPE OF WORKS
- Dismantle and dispose 2 x 4MW Motors and Install 2 x 4MW new motors.
- Dismantle 2 Vertical turbine Pumps for Refurbishment.
- Supply and install new platforms to match new motor and pump structure.
- Assemble pumps on site after service and install them back in its position (work in Progress).
- Install platform and flow meter in the water channel for flow measurement.
EMT delivered 60% of this project and is in progress rest of the works on time and on budget to meet client
requirements, with a high level of quality and safety.
Sydney Water West Camden STP
CLIENT
Sydney Water Corporation / Ventia
LOCATION
West Camden STP
YEAR
2016
SCOPE OF WORKS
- Inspection, Supply, Installation, Testing and commissioning works carried out (emergency breakdown repair works)
- Overhaul of the clarifier geared drive Trolley Gearbox
- Supply and install new Motor
- Supply and replace drive and non driven wheel Shaft Bearings
- Removal, supply and installation of new slew ring bearings (geared and ungeared)
and slip rings
- Remove Supply and Install New Scraper Blades
EMT delivered this project on time and on budget to meet client emergency breakdown repair
requirements, with a high level of quality and safety.
Sydney Water West Hornsby Clarifier 3
CLIENT
Sydney Water Corporation / Transfield
LOCATION
West Hornsby Treatment Plant
YEAR
2009
SCOPE OF WORKS
- Refurbishment of Clarifier No 3
- Strip old Prochem scraper system
- Replace with Hitachi scraper flights, wear strips, chain, bucket wheels and sprockets.
- Replace motors and gearboxes.
EMT delivered this project on time and budget to meet client requirements with a high level of
quality and safety.
Refurbishment of clarifier & SED.Tank
CLIENT
Hawkesbury City Council
LOCATION
Hawkesbury City Council
YEAR
2019
SCOPE OF WORKS
- Removal of all the mechanical and electrical component parts
- Clean and prepare tanks for rebuild
- Concrete repairing work on both the tanks
- Epoxy coating of surfaces where specified
- Fabricate all replacement components in 316 grade stainless steel
- Reconstruct the clarifier using the new 316 stainless components
- Replacement of electrical control gear and slipring assembly
- Testing and commissioning